Corrosion Engineering Services

Buried Utility Corrosion Assessments

A buried utility corrosion assessment evaluates how pipe materials, coatings, joints, soil, backfill, moisture, and installation details may be contributing to deterioration along an underground system.

Service overview

What this service involves

Buried infrastructure does not experience one uniform environment. Trench backfill, native soil, imported fill, drainage, leaks, groundwater, coating damage, electrical continuity, and dissimilar-metal connections can create sharply different exposure along the same alignment.

Calicore combines field documentation with targeted resistivity and chemistry testing, material identification, coating observations, and records review to determine what evidence supports maintenance, repair, monitoring, or a more specialized investigation.

Step by step

How the process works

The exact scope is matched to the project, but a typical assignment follows these steps.

  1. 01

    Review the alignment

    We map materials, coatings, joints, repairs, failures, trench conditions, and known changes along the buried utility.

  2. 02

    Select representative locations

    Inspection, field measurement, and sampling points are chosen around changes in soil, backfill, drainage, failures, and construction details.

  3. 03

    Document exposed conditions

    When access or excavation is available, the pipe, coating, joints, depth, moisture, soil, and damage are recorded before repair or removal.

  4. 04

    Set priorities

    Locations are compared and ranked for repair, monitoring, replacement planning, or additional investigation.

Review criteria

What the utility owner needs from the assessment

Location-specific documentation is essential because one soil sample or one excavation rarely represents an entire alignment.

What you receive

Typical project deliverables

  • Asset, soil, and installation-condition review
  • Targeted field testing and sampling
  • Damage and exposure mapping
  • Repair, monitoring, and further-investigation priorities

Common project needs

When this service is useful

  • Water and wastewater piping
  • Fire-service and site utilities
  • Recurring buried fitting failures
  • Rehabilitation and replacement planning

Frequently asked

Buried Utility Corrosion Assessments questions

Can one soil sample represent an entire pipeline?+

Rarely. Sampling and field measurement locations should reflect changes in alignment, soil, drainage, fill, depth, failure history, and construction details. The scope should match the decision and project scale.

Can the assessment include exposed pipe during a repair?+

Yes. A planned excavation can provide valuable access for coating observations, damage mapping, representative samples, and documentation before the pipe is repaired or removed.

Request a proposal

What to send us to begin

Send a short description of the work, any plans, specifications, or photographs you have, and tell us what you need the service to provide. Include a project location if it applies.

Request a proposal