Service overview
Thermal testing for your concrete mix submittal
A request for low-rho concrete adds a thermal requirement to the producer’s mix submittal. The project may call for a maximum thermal resistivity, a defined moisture condition, or a full dry-out curve. We review that requirement before testing so the results address the acceptance basis the engineer will use.
Our concrete thermal testing lab accepts suitable shipped cylinders or other agreed specimens from trial batches and production material. Keep each mix and batch identifiable. Include the specified method, casting date, curing history, specimen count, required units, and report deadline with the request.
Testing supports mix qualification and subsequent verification. It does not guarantee that every batch will meet a specification or replace strength, workability, durability, and other project requirements. Final acceptance remains with the responsible project reviewer.
