Service overview
What this service involves
Before mobilization, Calicore reviews the approved backfill, qualification results, placement records, target density and moisture, duct-bank or cable geometry, and the question the field check must answer. Test locations are chosen around representative placements, source changes, nonconforming density or moisture records, or critical sections identified by the project team.
Field access is coordinated so the probe can contact suitable material without creating an uncontrolled air gap or testing a disturbed exposed crust. Calicore documents the access, depth, placement zone, current temperature and moisture context, then collects repeat measurements and representative samples where laboratory confirmation is part of the scope.
The field result is compared with the qualified material and documented placement condition. Because a current in-place point is not the same as a controlled dry-out curve, the report explains what can be concluded from the comparison and which questions still require laboratory conditioning or designer review.