Local project context
Planning septic soil testing in Nixon / Pyramid Lake
Nixon and nearby Pyramid Lake parcels require a land-status check before a county-style septic process is described. Tribal trust, allotted, and fee lands can involve different authorities, approvals, and technical assistance.
Lake, river, flood, and water-supply protections also make a generic regional perc assumption inappropriate. The responsible authority should approve the investigation plan before any pits or percolation holes are opened.
