San Bernardino County · Lower Colorado River and Eastern Desert

Septic system design in Big River, California

Septic design and OWTS planning for Big River properties. Confirm sewer and agency jurisdiction, evaluate site and percolation data, plan the disposal and replacement areas, and prepare a parcel-specific design basis.

Local project context

Planning a septic system for a Big River property

Big River is an unincorporated Colorado River community opposite Parker, Arizona, with riverfront neighborhoods and desert uplands.

Shallow groundwater, floodplain position, river setbacks, community water service, and terrace changes need to be mapped at the parcel.

A septic system design should follow the actual buildable footprint and wastewater demand. The home, grading, driveways, utilities, wells, drainage, setbacks, and a future replacement area all affect whether a layout can work.

Jurisdiction and sewer service

Confirm the review path before field work

Big River is under County jurisdiction and has a community services district whose utility role should be confirmed for each project.

Jurisdiction depends on the parcel. County EHS is the technical-review agency for unincorporated County work, while incorporated projects begin with the applicable city and may involve County EHS, a sewer district, and a Regional Water Board. For County-reviewed work, current LAMP and percolation-report requirements should be confirmed with the agency for the specific parcel.

Check the reviewing agency

Design and permitting

From Big River site evaluation to septic design

A useful septic plan connects the site's soil and percolation evidence to an approvable layout and the next permitting step.

  1. 01

    Confirm the parcel and review path

    Start with the address or APN, proposed use, city or County boundary, public-sewer availability, and any direction already received from the reviewing agency.

  2. 02

    Establish the site and soil basis

    Review the percolation report, soil profile, grading concept, slopes, drainage, wells, setbacks, groundwater or bedrock evidence, and the space available for the proposed system.

  3. 03

    Lay out the primary and replacement areas

    Coordinate the building, access, utilities, grading, and wastewater flow with a usable dispersal area and the replacement area required by the applicable agency.

  4. 04

    Prepare a parcel-specific design package

    Document the design assumptions, system components, calculations, site layout, and supporting information needed for the next agency review and permit step.

Parcel-specific scope

Design information to resolve

The final septic layout and sizing depend on more than a percolation number. The design must fit the parcel and meet current agency, public-health, and water-quality requirements.

Property-owner questions

Septic system design in Big River

Who reviews septic design for a property in Big River?+

Big River is under County jurisdiction and has a community services district whose utility role should be confirmed for each project. For unincorporated County parcels, San Bernardino County Environmental Health Services normally handles technical OWTS review. Confirm the exact agency and sewer status from the parcel before designing or submitting.

Does a perc test by itself approve a septic design in Big River?+

No. Percolation results are one design input. The reviewer also considers the soil profile, groundwater and bedrock separation, slope, setbacks, wastewater flow, grading, sewer availability, and the required replacement area.

Can a septic system be designed before testing is complete?+

A preliminary feasibility review can begin with the parcel information and concept plan. Final sizing and a permit-ready layout depend on the applicable agency's requirements and adequate site-specific soil and percolation information.

Primary sources

San Bernardino County wastewater references

Use the current agency documents for planning, and confirm requirements for the parcel, proposed system, and responsible jurisdiction.

  1. Wastewater and land-use program San Bernardino County Environmental Health Services
  2. Local Agency Management Program San Bernardino County — County OWTS siting, design, operation, and management program.
  3. Percolation Testing and Reporting Standards San Bernardino County — Field procedures and report requirements currently linked by EHS.
  4. Onsite Wastewater Treatment Systems bulletin IB-00018 San Bernardino County Land Use Services — Construction-facing bulletin updated July 30, 2026.
  5. Water Quality Control Policy for Siting, Design, Operation and Maintenance of OWTS California State Water Resources Control Board

Related local services

Continue the septic project from testing through design.

Percolation testing in Big River Septic soil testing in Big River San Bernardino County septic design directory San Bernardino County soil testing directory

Start with the parcel

Get the scope right for your Big River project.

Send the address or APN, a site or grading plan if available, the proposed use, and any existing septic records or agency comments. Calicore can help identify the likely soil testing, percolation, or septic design step.

Ask about this property