Local project context
Soil and percolation testing for Blue Jay septic projects
Blue Jay is a commercial and residential hub west of Lake Arrowhead with heavily developed mountain parcels along State Route 189.
Existing utilities, prior grading, retaining systems, traffic access, and limited undeveloped ground can be as important as subsurface absorption conditions.
Septic soil testing is useful only when the field locations represent the proposed disposal area. Surface appearance, a regional soil map, or a result from a nearby parcel cannot establish the absorption rate or soil conditions for this site.
