Local project context
Soil and percolation testing for Lake Gregory septic projects
Lake Gregory is the lake-centered portion of the broader Crestline community, with developed slopes draining toward a small mountain reservoir.
Surface-water protection, steep lots, existing retaining and fill, and limited replacement area are central to parcel screening.
Septic soil testing is useful only when the field locations represent the proposed disposal area. Surface appearance, a regional soil map, or a result from a nearby parcel cannot establish the absorption rate or soil conditions for this site.
