The tested material controls
A result is tied to the submitted or in-place material, density, moisture, preparation, and method—not to the city name.
153 city project guides
City-specific planning guides for shipped soil and material samples, thermal dry-out curves, cable-route sampling, and project-based in-situ surveys.
A result is tied to the submitted or in-place material, density, moisture, preparation, and method—not to the city name.
Climate, broad geology, earthwork, infrastructure, access, and seasonal conditions help choose representative samples, stations, routes, and work windows.
Material samples can be shipped from any U.S. project, and in-situ surveys are available when the scope supports mobilization.
State by state
Every guide explains local planning context, the test process, useful project inputs, access and interference considerations, deliverables, limitations, and what to send for a proposal.
Start with the project question
Send the location, plans, specification, material, target density and moisture, sample count, and schedule.
Request a proposal